| |
Client: Network Rail London North Eastern Zone Corus has worked closely with Network Rail to produce a strategic feasibility report covering the engineering works required to achieve the North Transpennine Upgrade project. The aim of the project is to achieve a 45 minute journey time between Leeds and Manchester Piccadilly, with a service running every 15 minutes. Services Provided
Special Features | |
